Construction well underway for new South Early College HS

[photoshelter-gallery g_id=”G0000nXU3ZclGdKY” g_name=”2015-Bond-SECHS” width=”600″ f_fullscreen=”t” bgtrans=”t” pho_credit=”iptc” twoup=”f” f_bbar=”t” f_bbarbig=”f” fsvis=”f” f_show_caption=”t” crop=”f” f_enable_embed_btn=”t” f_htmllinks=”t” f_l=”t” f_send_to_friend_btn=”f” f_show_slidenum=”t” f_topbar=”f” f_show_watermark=”t” img_title=”casc” linkdest=”c” trans=”xfade” target=”_self” tbs=”5000″ f_link=”t” f_smooth=”f” f_mtrx=”t” f_ap=”t” f_up=”f” height=”400″ btype=”old” bcolor=”#CCCCCC” ]

Construction on the new South Early College High School is well underway. Roof installation and exterior framing is currently ongoing, along with concrete installation for the parking lot, building sheathing and waterproofing.

The 57,000 square foot facility, located on the campus of Houston Community College South Campus, will accommodate 400 students and will feature flexible learning spaces that support the school’s technological programs, including robotics, computer technology, and software engineering. The new building is slated to open for the 2016-2017 school year.

Photo gallery of HISD building projects