Tag Archives: 2012 bond

Rusk School to showcase new middle school wing

The Rusk School will hold an open house on Friday and a ribbon-cutting ceremony on Monday to show off its new middle school wing, which will soon open to students.

The PK-8 school’s 21,000-square-foot wing will serve 250 students and features seven classrooms, two science labs and a computer lab. The open house will take place from 5 to 6:30 p.m. on Friday at the school (2805 Garrow), and the ribbon cutting is set from 9 to 11 a.m. on Monday.

The new facility was built with funds from HISD’s 2007 bond program. Located in the city’s East End, the school emphasizes college and career readiness and offers pre-AP courses and a STEM magnet program.

Design for new HSPVA becomes ‘more exciting and a little more real’

Architects presented design renderings and 3D images of the new High School for Performing and Visual Arts Thursday at a community meeting that provided a more detailed site plan of the five-story facility.

[photoshelter-gallery g_id=’G0000lUhhKm6fQ6k’ g_name=’HSPVA-gallery’ width=’600′ f_fullscreen=’t’ bgtrans=’t’ pho_credit=’iptc’ twoup=’f’ f_bbar=’t’ f_bbarbig=’f’ fsvis=’f’ f_show_caption=’t’ crop=’f’ f_enable_embed_btn=’t’ f_htmllinks=’t’ f_l=’t’ f_send_to_friend_btn=’f’ f_show_slidenum=’t’ f_topbar=’f’ f_show_watermark=’t’ img_title=’casc’ linkdest=’c’ trans=’xfade’ target=’_self’ tbs=’5000′ f_link=’t’ f_smooth=’f’ f_mtrx=’t’ f_ap=’t’ f_up=’f’ height=’400′ btype=’old’ bcolor=’#CCCCCC’ ]

Continue reading

Lee HS students add life to architects’ designs for new school

As architects design a new 21st century Lee High School, they are thinking about flexible learning spaces, integrated technology and increased light. But getting students involved in the design process is providing the school’s identity.

[photoshelter-gallery g_id=’G0000mLFT.UddUBU’ g_name=’20140327-Lee-Community-Meeting’ width=’600′ f_fullscreen=’t’ bgtrans=’t’ pho_credit=’iptc’ twoup=’f’ f_bbar=’t’ f_bbarbig=’f’ fsvis=’f’ f_show_caption=’t’ crop=’f’ f_enable_embed_btn=’t’ f_htmllinks=’t’ f_l=’t’ f_send_to_friend_btn=’f’ f_show_slidenum=’t’ f_topbar=’f’ f_show_watermark=’t’ img_title=’casc’ linkdest=’c’ trans=’xfade’ target=’_self’ tbs=’5000′ f_link=’t’ f_smooth=’f’ f_mtrx=’t’ f_ap=’t’ f_up=’f’ height=’400′ btype=’old’ bcolor=’#CCCCCC’ ]

Continue reading

Parker ES students present their wish list for new school

Don’t paint the girls bathroom walls pink was one of many requests from a small group of Parker Elementary School students who wrote a list of 26 must-haves for the design of the new campus.

The students presented the list Wednesday to the school’s architect, sharing ideas for solar panels, automatic sinks, open windows, larger classrooms and music rooms, an updated library with reading zones for different grade levels, and individual spaces for the gym, cafeteria and auditorium.

[photoshelter-gallery g_id=’G0000Q5z6a0GGN2o’ g_name=’20140326-ParkerPAT’ width=’600′ f_fullscreen=’t’ bgtrans=’t’ pho_credit=’iptc’ twoup=’f’ f_bbar=’t’ f_bbarbig=’f’ fsvis=’f’ f_show_caption=’t’ crop=’f’ f_enable_embed_btn=’t’ f_htmllinks=’t’ f_l=’t’ f_send_to_friend_btn=’f’ f_show_slidenum=’t’ f_topbar=’f’ f_show_watermark=’t’ img_title=’casc’ linkdest=’c’ trans=’xfade’ target=’_self’ tbs=’5000′ f_link=’t’ f_smooth=’f’ f_mtrx=’t’ f_ap=’t’ f_up=’f’ height=’400′ btype=’old’ bcolor=’#CCCCCC’ ]

Continue reading

Video details progress on creating a 21st century Waltrip HS

[vimeo http://vimeo.com/87899474/ w=320&h=205]

A new video released by HISD highlights efforts to turn Waltrip High School into a 21st century campus by building a partial three-story building replacement and updating the space with general building renovations – all of which will be funded by the district’s 2012 bond program.

Continue reading

Small business experiences huge growth in working with HISD

Small-business professionals heard a success story Tuesday about a minority-owned company that has taken its business to new heights, earning contracts to build HISD’s new Milby High School and DeBakey High School for Health Professions.

“Everyone in our construction office is ecstatic about the work they’re doing,” said HISD Team Lead for Supplier Diversity Bernard Willingham, who shared Taylor Construction Management’s story with about 200 small-business professionals at the Greater Houston Business Procurement Forum’s monthly breakfast.

Continue reading

Local subcontractors urged to bid for Delmar construction work

The second bid package for the construction of the new Delmar-Tusa Athletic Complex will include underground and structural concrete site work and will be open for subcontractors to bid on by the end of March. 

“If you meet our pre-qualifications, your references come back great, and you’ve done similar projects to this magnitude, all of these factors will go into consideration when making our selection of subcontractors,” said DivisionOne Construction President Todd Hamby during a meet and greet Thursday at HISD with the firm that was selected as Delmar’s Construction Manager at Risk (CMAR). “We want to hire companies that will make this project a success.”

Continue reading