Category Archives: 21st century schools

Lamar HS students enjoy first day of school in new building

Gathered outside Lamar High School’s new main entrance, cheerleaders, Rangerettes, and the color guard shook their pompoms to the beat of the music played by the band, welcoming students back to school. 

Inside, the hum of conversation filled the grand hall as hundreds of students peered around the two-story room, admiring the tall glass walls and massive, blue staircase, as they waited for the first bell to ring. 

“The kids walked in wide-eyed saying, ‘It’s beautiful,’” Lamar Principal Rita Graves said, recalling how eager students had been to see the school during last week’s Texan Prep Days. “They’re just really excited to be learning in such a cool place.” 

Continue reading

Interim Superintendent gets sneak peek of new Lamar and Northside

Interim Superintendent Grenita Lathan walked into the new academic building at Lamar High School on Thursday and stopped for a moment to take it all in. 

Standing in the grand hall, Lathan’s eyes widened as she scanned the two-story, glass-paned entry way and massive, bright blue staircase leading to upper floors. 

“This is wonderful,” Lathan said, smiling as she greeted Lamar Principal Rita Graves. 

Continue reading

Two years later: Schools damaged by Hurricane Harvey moving forward

Nearly three feet of water rippled through freshly painted hallways, carrying brightly colored classroom decorations that fell from wet walls. Bookshelves collapsed and spilled its contents, and desks were scattered about by the force of the water.    

It’s been two years since that scenario played out at four HISD elementary schools — Braeburn, Mitchell, Scarborough, and Kolter.  

Just as faculty and staff at each school had prepared for their newest group of students, Hurricane Harvey made landfall on the Texas coast. The storm inflicted damage so significant that students and staff had to be relocated to temporary campuses.  

Continue reading

Construction progressing at new Mitchell ES

Construction on the new Mitchell Elementary School is progressing as the concrete foundation and hollow core planks are now complete.

Crews have begun the erection of the structural steel and site paving is nearly complete.

The campus is one of four elementary schools — Braeburn, Mitchell, Scarborough, and Kolter — being rebuilt as a result of damages sustained in 2017 during Hurricane Harvey.

“Although Harvey tested our resiliency, it also created an opportunity for our community to be blessed with a new school for our very deserving students,” Mitchell Principal Elizabeth Castillo said. “We are so eager as we watch the progress of our building.  With the foundation being poured, we know that our Mitchell 3.0 will be a beacon of hope as we work to revitalize our community after Harvey.”

Continue reading

Steel structure placed in Kolter ES

Construction continues at Kolter Elementary School with structural steel of the new building nearly complete.

Crews will now begin the installation of both the first- and second-floor slabs. Exterior wall framing will begin next month.

“Watching the beams and framing come to life has made all the difference,” Kolter Principal Julie Dickinson said. “It’s so exciting to see a second floor and to begin to visualize learning spaces and common areas. I can’t believe we’re less than a year away from moving into our new school home.”

Continue reading

Construction continues at Scarborough ES

Work is progressing at Scarborough Elementary School with the building foundation and hollow core plank installation now complete.

Installation of the first and second-floor slabs are in progress.

Scarborough is one of four elementary schools — including Braeburn, Mitchell, and Kolter — being rebuilt as a result of damages sustained in 2017 during Hurricane Harvey.

Scarborough Principal Miriam Medina said the news of the construction progress has made the school community feel a sense of anticipation.

Continue reading

Construction progresses at Braeburn ES

Steel structures and concrete slabs are now underway at the new Braeburn Elementary School with the installation of underground utilities and floor planks completed.

The campus is one of four elementary schools — Braeburn, Mitchell, Scarborough, and Kolter — being rebuilt as a result of damages sustained in 2017 during Hurricane Harvey.

“Our community and staff are excited to see our school building come to life from the ground up,” Braeburn Principal Amanda Rodgers said. “Now that the foundation is being set, it’s getting even easier to envision what our future home will look like. We look forward to returning to our neighborhood soon.”

Continue reading

Bond Oversight Committee members receive program update, tour Barbara Jordan Career Center

The HISD Bond Oversight Committee got an up-close look at the new Barbara Jordan Career Center during their second quarter meeting Tuesday.  

Committee members made their way up the school’s modern learning stairs and through hallways filled with natural light and turquoise accent walls. The group took pictures along the way and tried on a simulator helmet in the welding classroom.   

The tour — led by Principal Ross McAlpine, HISD Construction Services Senior Manager Sizwe Lewis, and HISD Project Manager Zorana Marquez-Campos — made stops in the school’s health science classroom, and cosmetology, automotive and diesel, culinary, welding, and construction management labs.  

Continue reading

2012 Bond Program nears completion

Almost seven years after Houston voters approved a $1.89 billion bond to replace and repair 40 schools across the district, including 29 high schools, the 2012 Bond Program is coming to a close.  

Only four schools remain under active construction as part of their original scope of work – Northside, Lamar, Austin, and Bellaire high schools. 

“We’re excited about the work we’ve done over the summer,” Construction Services Officer Derrick Sanders said. “We’re proud of the 21stcentury learning spaces we’ve created.” 

Continue reading

Lamar HS construction reaches 80 percent completion

In 2017, Lamar High School celebrated its 80th anniversary with a groundbreaking ceremony. Now the school’s construction has reached nearly 80 percent completion, with doors of the school’s new academic building opening to students for the 2019-2020 school year.

Both painting and flooring in the gymnasium is underway along with the installation of first- and second-floor ceilings, culinary and dining equipment, and joining the new building addition’s HVAC to the existing facility.   

Phased renovations to the existing facility are also in progress and an enclosed second-story skybridge connecting the two buildings is set for completion in August. 

Continue reading