Tag Archives: construction services

Scarborough ES welcomes Huskies to new home

A group of enthusiastic teachers clad in blue Huskies t-shirts cheered as students arrived at the new Scarborough Elementary School for the first time on Monday.

After undergoing temperature checks, the students marveled at their new surroundings and the colorful bilingual welcome signs awaiting them.

Fourth-grader Elizabeth Garza wore a black mask imprinted with the smile of a Cheshire cat, but the sparkle in her eyes made it clear she was smiling just as wide underneath it.

Continue reading

Mitchell ES celebrates a ‘powerful’ return

As Mitchell Elementary School students arrived for the first day of in-person instruction, there were plenty of bright eyes and broad smiles, evident even underneath their masks.

The students entered the new school and looked on in amazement at their new surroundings. Teachers stood nearby reminding them to walk while observing physical distancing.

With their backpacks filled, the students made their way to their classrooms, greeted teachers, and quickly found their seats, ready to begin the school day.

Continue reading

For one HISD family, a new school building to call home

A day before Hurricane Harvey hit Houston in 2017, Tiffany Irving and her son Grant eagerly delivered school supplies to his kindergarten classroom at Mitchell Elementary, just south of Hobby Airport.

Little did they know then that Grant’s supplies — along with the rest of his building and three other elementary schools across the district — would be destroyed in the coming days as the storm dumped unprecedented amounts of rain on the city.

Unfortunately, the damage wasn’t limited to the school. The Irving’s home just around the corner from the school also flooded.

Continue reading

Kolter ES welcomes students to new campus for in-person instruction

Kolter Elementary School Principal Julianne Dickinson began to feel the weight of Monday morning before the sun went down the day before.

For Dickinson, Monday was different for a few reasons — the start of in-person instruction, the return of students to classrooms after eight months, and the required use of masks due to the COVID-19 pandemic.

But the most special reason was that it was her students’ first day in their newly constructed school.

Continue reading

Kolter ES teachers adjust to teaching in new school without students

When walking into Jennifer Heemer’s fifth grade classroom at Kolter Elementary School, it’s hard not to get excited about learning.

The walls are adorned with colorful decorations, including a poster reminding her students to “think outside the box” and class photos from her 21 years of teaching. Natural light from a wall of large windows fills the room and illuminates the two rows of perfectly-arranged desks.

There’s only one thing missing. Students.

Continue reading

As construction nears completion, Austin HS looks to the future

For more than 80 years, the red-bricked Austin High School has been a mainstay in the Eastwood community. With construction nearing completion, the new school now strikes a balance of the past and present.

The $80.9 million project features modern classrooms, flexible learning spaces, and sound and lighting upgrades to the existing auditorium. The Art Deco-influenced façade also has been preserved and refurbished as a part of the project.

“This school has been here for more than 80 years. It was important to keep a part of this building that has been present in this community for so long,” Austin Principal Steve Guerrero said. “The entire building is just phenomenal. It feels very grand with lots of natural light. Every single part of the building is exciting.”

Continue reading

Principals of schools damaged by Hurricane Harvey excited to return ‘home’

A new school year typically brings a mix of emotions for Kolter Elementary School Principal Julie Dickinson. Feelings of excitement mingled with the hope that everything will run smoothly.

As Dickinson readies for the start of the 2020-2021 school year, she is once again experiencing those same feelings, but this time they’re tinged with the promise of new beginnings.

“There was a huge loss to get where we are today,” Dickinson said. “But I can’t think of a more deserving community.”

Continue reading

Austin HS to open in January 2021 due to COVID-19

The new Austin High School is now scheduled to open in January 2021 — a delay caused by the COVID-19 pandemic.

The school was originally scheduled to open in August 2020. HISD Construction Services Officer Derrick Sanders said the new timeline was due to a three-month delay in the school’s furniture shipment and manpower shortages caused by mandated social distancing requirements resulting from the COVID-19 pandemic.

Austin will remain at its current temporary learning center located across South Lockwood Drive until the new facility opens.

Continue reading

Lamar HS construction nears completion

Construction at Lamar High School is continuing, as allowable under the public health guidelines, with renovations to the original building now 80 percent complete.

The renovation work, designed to preserve the building’s historically significant architecture, included the construction of a new child care wing, welcome center, and updated ROTC and Career and Technical Education classrooms.

The athletic fields — including football, baseball, softball, soccer practice fields — and tennis courts also are underway.

Continue reading

Scarborough ES construction 94 percent complete

Construction at the new Scarborough Elementary School is steadily progressing, despite the district being closed due to the COVID-19 pandemic.

Work on the campus has continued, as allowable under the public health guidelines, with a reduction of the workforce to adhere to social distancing requirements.

The $23 million project is tracking at 94 percent completion, with site work, paving, underground utilities, structural steel, roofing, interior wall systems, and mechanical, electrical, and plumbing installation complete. Exterior wall systems and interior finishes are ongoing.

Continue reading