Tag Archives: Building Excellence

HISD Business Operations launches new brand focused on students

[su_document url=”https://blogs.houstonisd.org/news/wp-content/uploads/sites/2/2019/06/Business-Operations-Annual-Report.pdf” height=”840″]

With more than 7,000 employees, Business Operations is the largest division in HISD. But what exactly do we do?

Before students can ever file into their classrooms, bus drivers and crossing guards must get them safely to school. Cafeteria workers must make them a nutritious breakfast. Custodians, police officers, and construction crews must make sure they have new, clean, safe spaces in which to learn.

The breadth of our work touches all facets of the district, and support is at the heart of everything we do. We help lay the foundation for student success — most of the time behind the scenes.

Continue reading

Construction of new Austin HS to reach milestone on Monday

An immense construction crane will lift the first wall of the new Austin High School into place on Monday, marking a significant development for the 2012 Bond project.

The news was announced to the school’s Project Advisory Team on Wednesday during its regular meeting, which also included general construction and budget updates.

The $80.9 million project, which is scheduled to be completed in 2020, will feature modern classrooms and flexible learning spaces while also preserving the historic front facade of the original main building, which opened in 1937.

“Tours of the construction site for small groups of students would really build excitement about the progress we’re making,” HISD Construction Services Senior Manager Meredith Smith said. Continue reading

Austin HS students move into temporary facility while new campus is constructed

[photoshelter-gallery g_id=”G0000I3x7IzzqgxA” g_name=”20180108-Austin-HS” width=”600″ f_fullscreen=”t” bgtrans=”t” pho_credit=”iptc” twoup=”f” f_bbar=”t” f_bbarbig=”f” fsvis=”f” f_show_caption=”t” crop=”f” f_enable_embed_btn=”t” f_htmllinks=”t” f_l=”t” f_send_to_friend_btn=”f” f_show_slidenum=”t” f_topbar=”f” f_show_watermark=”t” img_title=”casc” linkdest=”c” trans=”xfade” target=”_self” tbs=”5000″ f_link=”t” f_smooth=”f” f_mtrx=”t” f_ap=”t” f_up=”f” height=”400″ btype=”old” bcolor=”#CCCCCC” ]

Austin High School students and staff began the spring semester on Monday in a temporary campus in preparation for the start of construction on their new building.

The new Temporary Learning Center — dubbed by school officials as the “TLC” and made up of temporary buildings — was built to ensure student and staff safety during construction. It is located along South Lockwood Drive, directly behind the existing school building.

Located in Houston’s East End, the 80-year-old comprehensive high school is being rebuilt as part of the Houston Independent School District’s voter-approved 2012 Bond Program. Plans for the $79.6 million project call for a new facility that preserves the original building’s architecturally significant building structure and can accommodate up to 2,000 students. Continue reading